CHARLES DE GAULLE airport terminal 2F is to have a new roof. The futuristic building, mainly used by Air France, which partly collapsed last May killing four people, will be rebuilt using a domed structure. The lower levels are largely unaffected and the work, scheduled to be completed by 2008, should cause minimum further disruption. Last month the French government said it planned to press ahead with partially privatising A”roports de Paris which also operates Orly.
http://www.adp.fr