PRESTWICK AIRPORT”S major facelift is finally under way, and at double speed too. The much needed ”3m remedial work is expected to be completed by the end of April. At the present time it is under wraps as contractors work behind the scenes to transform parts of the airport which were designed and built in the 1960s. The terminal is being transformed by a makeover of the check-in area. But the big change will be in the airport's retail outlets which are getting a massive facelift with eye-catching new shopfitting and new signage. The central concourse area is also being overhauled with new floor coverings and new retail units being added. The duty free area will also be subjected to a major makeover later in the year.
http://www.gpia.co.uk